Example of construction schedule
How long does it take to build a house? With efficient organisation and a well-prepared plan, it is possible to build a house at a predictable rhythm. The final time depends on the complexity of the block, the chosen technology and the availability of teams, but with standard assumptions the pace of construction looks more or less like this:
0-2 months - design and paperwork
This is the moment to prepare the documentation and the construction project. The choice between pre-designed and customised versions is all about pace - the former allows you to get off to a quicker start, the latter gives you a better fit for the plot. It is also the time for permits and preparation for the start of construction. It is essential to have the building delineated, which determines its exact position on the plot and allows ground work to begin.
3-6 months - raw state
Once the plot has been prepared, earthworks begin, followed by the construction of the foundations. Then the walls, ceilings and roof are built. Increasingly, builders are opting for cellular concrete blocks, which speed up the work and make it easier to reach zero state. The roof, which closes the building, is also crucial at this stage. It is worth mentioning that when the building has reached the "shell and core" stage (i.e. with all windows and doors in place), the investor can be sure that the house is protected against the weather and that further work can begin.
6-10 months - installation and finishing
The next phase is to carry out the installations, plastering and flooring, followed by the finishing work. The schedule can be shortened if some of the prefabricated elements are used, but traditional technology works just as well.
10-12 months - acceptance and completion
At this stage, the investment takes its final shape. The house is prepared for interior decoration or for living in - depending on the standard the investor intended. For some, it is the moment of finishing, for others - fulfilment of the dream of a dream home. The whole process is completed with formal technical acceptance, notification of the completion of the construction to the relevant office and closure of the documentation. Looking at all the stages, it is easier to understand how long it takes to build a house from the first foundations to the commissioning of the investment.